Use Background
In the construction process of many power lines, it is often restricted by terrain and environmental characteristics. For example, the wiring process must cross some rivers, lakes, industrial and commercial areas, residential areas, roads, railways, or hills, canyons, forestry. Seedlings and so on. These factors have led to a geometric increase in construction costs, construction schedules have to be delayed or even interrupted, and construction quality cannot be guaranteed. Power lined drones can effectively protect crops and seedlings from deforestation. Residential buildings do not need to be demolished and demolished. Construction workers no longer travel long distances and overcome obstacles, saving a large number of economic compensation due to them, and greatly speeding up construction progress. To reduce wire surface damage. The 6-wing power lined drone technology has reached a stage of full maturity. It has achieved thousands of aerial wiring operations and has rich experience in aerial wiring.
Power line drone- HYPLD-6
Simple design.
Integrated parts for easier maintenance and durability.
The wire never leaks out.
Durable, safe and secure.
Efficient and easy to use.
Self-locking paddle, more convenient to install paddle, enclosed dust-proof and waterproof motor is more durable, enclosed motor holder protects ESC.
Built-in power display
Model | HYPLD-8H | HYPLD-6 | Model | HYPLD-8H | HYPLD-6 |
Axle distance | 1080mm | 960mm | Height | 450mm | 400mm |
Fail-Safe | with | GPS | with | ||
Maximum tension | 8kg | 5kg | No-load endurance | 25-30min | |
Maximum take-off weight | 14kg | 10.4kg | Load endurance | 12-18min | 12-15min |
Flying speed | 0.15m/min | Flight mode | Manual control; ATT; GPS | ||
Empty weight | 4kg | 3.4kg | Battery | 16000mAh 6S | |
Maximum flight distance | 2-4km | Flight height | 0-1000m (adjustable) | ||
Working Temperature | -5---50 | Diameter of traction rope | 2-4mm |
Functions: GPS positioning, full-auto return, semi-auto return, runaway protection, headless mode, heading lock, low-voltage protection alarm, battery power backhaul, national exclusive high beam function, OSD flight data real-time backhaul, etc.
Characteristics
Low requirements on topography, no limit on altitude, no problem in high altitude area;
High efficiency and high attendance rate, short adjustment time when taking off
The aircraft is light and flexible with little vibration;
Environmentally friendly and meets the requirements of national energy conservation and environmental protection;
Safer and can resist six levels of wind;
Easy to maintain, and low cost on use and maintenance;
More efficient, drag 3.5mm, 12 kgs of rope to 1000 meters.(Four-axis drag 2.0mm);
Payload of 2.0 dupont rope that can fly for 25 to 30 minutes;
Free operation training, welcome to our company to participate in and learn simple UAV maintenance technical service.
| HYPLD-8H | HYPLD-6 |
Drone | 1 set | 1 set |
High power multi kinetic energy charger | 1 set | 1 set |
Professional remote control | 1 set | 1 set |
16000mah high quality battery | 2 pcs | 2 pcs |
2200mah remote control battery | 2 pcs | 2 pcs |
Battery voltage capacity checker | 1 set | 1 set |
Tool kits | 1 set | 1 set |
Aviation aluminum box | 1 pcs | 1 pcs |
Spare screws | 1 pack | 1 pack |
Backup battery strap | 4 pcs | 4 pcs |
Spare propeller | 8 pcs | 6 pcs |
Application
The trees in the virgin forests often encounter bushes, virgin forests, etc. during the construction of the national grid. This will definitely affect the progress of the construction. When passing through the virgin forest, the trees cannot be felled. This undoubtedly adds a lot of difficulty to the construction of the project, and with the lined drone, it is easy to fly over the trees and cast a guide rope to the ground.
In the traditional wire-laying operation on the Yangtze River, the tow rope can only be towed by the tugboat over the water surface. The construction water surface must be sealed first. The closure of the navigation will also cause many economic losses to the country and the construction party. The personnel stood on the ship and remotely dragged the helicopter of the guide rope so that the guide rope could fly over the Yangtze River and avoid sealing.
In the construction will also encounter swamps, lakes, farmland, highways, mountains, etc. when people are unable to achieve the construction of the line, the line of drones also show their talents, complete the task.
The situation of charging across the power usually exists in the process of circuit reconstruction. It is necessary to straddle a new line on the basis of a power-on line. In order to ensure the safety of construction workers, traditional construction can only be used first. After the line is powered off and then constructed, the overhead drone can be used to avoid power outages.
![]() |
NEW LANDLE TECHNOLOGY CO., LTD.
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Ltd. |